← All guides

Simulation

Performance ratio benchmarks for Indian solar (state averages explained)

How REEOS compares your PR and CUF to state bands — and why a single national default misstates Gujarat vs Maharashtra sites.

  • 8 min read
  • 10 October 2026
  • Solarian Dynamic Energy

State-average PR and CUF bands exist because irradiance, soiling, and grid availability differ materially between Gujarat, Maharashtra, and Rajasthan.

REEOS prints your project PR and CUF beside the state reference in every bankable run so diligence can see whether you are inside a plausible band — not whether you matched a generic default.

Use the waterfall to explain why PR differs: soiling, temperature, and availability often dominate on industrial rooftops.