01CodesForeign tools miss Indian data
IS 875, IS 1893, and DISCOM at the pin — not a US default.
Indian codesFive weather filesOne PDF
Solar simulation with a loss trail lenders can read — IS 875 and IS 1893 at the pin, weather locked, bankable PDF in one run.
4 plants · 14+ plant-years · Maharashtra, Gujarat, Rajasthan
BVJ rooftop · 210.1 kWp · locked PVGIS year · every cut is a real kWh.
18,01,811
kWh leftEngine K · PVGIS locked
Sunlight on roof
Full GHI on the roof
1,801,811 kWh of GHI on the BVJ tin-shed aperture in a locked PVGIS year.
Plane of array starts here. Nothing sold yet.
Every loss visible. Nothing hidden.
10-year error
-0.39%Metered 6,53,350 vs REEOS 6,55,930 MWhTypical year (ex-Y6)
0.27%Mean |error| across nine quiet yearsAll-year |error|
0.60%Includes the Y6 dipWorst year
Y6 · +3.54%Metered 63,100 · model 65,420Why bids stall
01CodesIS 875, IS 1893, and DISCOM at the pin — not a US default.
02TrustA PR number is not a loss trail a lender can read.
03TimeOne PDF in the same run. Not a week of Word files.
Start on India. Pick a state, then a city. Next walks capacity, kit, year, and the unlock PDF.
Click a step · 1 of 5
Resolving the pin
Compared at your pin. Best one locked. Shown in the PDF.
Cold-morning voltage. Cable current at peak heat. Failures stop the run.
Full datasheets, citations, 25-year wear. One file.
One workspace. No spreadsheet between production and storage.
Public pages only
Each row is something REEOS ships in the product. Competitor cells are only what their own sites say — not a feature hunt.
Based on each vendor's public pages, checked October 16, 2026. “—” means not listed on their public pages.
| What REEOS does | REEOS | PVsyst | Aurora / HelioScope | OpenSolar | ARKA 360 |
|---|---|---|---|---|---|
| Resolves wind zone (IS 875), seismic zone and state rules at the pin | ✓ | — | — | — | — |
| Compares 5 weather sources, picks the best and shows which | ✓ | — | — | — | — |
| Blocks unsafe string lengths (cold-morning voltage over the inverter limit) | ✓ | — | — | — | — |
| Checks cable current rating at the site's peak temperature | ✓ | — | — | — | — |
| Plausibility check on every run against typical bands and state averages, printed in the report | ✓ | — | — | — | — |
| Yield range across 5 weather datasets, for any percentile you choose | ✓ | — | — | — | — |
| One PDF with full module and inverter datasheets, source citations and 25-year degradation | ✓ | — | — | — | — |
| Multi-site solar and BESS tender analysis | ✓ | — | — | — | — |
Saved to our list. Sandbox link by email. Reply within one business day.
Start on a trial. Move to a seat when the PDF is in the bid.
Trial
A few days on real projects before you buy seats.
Most teams
Per seat
Weekly rooftop and ground-mount. Weather, losses, PDF.
Custom
Multi-site solar, BESS, tenders, and a named contact.
Indian codes at the pin, five weather sources, and a loss trail you can hand a lender. Read the public comparison and the PVsyst alternative page.